Team Build vs. Design-Bid-Build

When looking to construct, renovate or expand a building, one of the first questions to address should be which project process to utilize. Consideration of potential design, estimation of costs, opportunities for cost savings (value engineering), along with realistic project and permitting timelines are vital to meeting budget requirements, project expectations and a providing a successful experience. The two processes to take into consideration are Team Build and Design-Bid-Build.

Read More
EducationAshley Ryan
Port Townsend High School – Elevator/ADA Upgrades

We are pleased to reveal the completion of our project at Port Townsend High School . The elevator and ADA upgrades included the addition of a 3-stop elevator at the front of the Main building along with a 2-stop elevator at the high school’s Annex Building. These additions allow students with limited mobility to access the third floor and provide easier access to the second floor.

Read More
Breaking Ground On New Recycling Plant For Sutter Metals

Merit Construction plans on breaking ground on a new 30,000 square foot recycling plant for Chad Sutter of Sutter Metals, LLC in Tacoma, Washington in late September 2019.  The Butler Manufacturing pre-engineered metal building will have 27,000 square feet of plant area and 3,000 square feet of covered roof and sits on a 3.18-acre site on South Burlington Way. 

Read More
Black Fleet Brewing - News Tribune

Black Fleet Brewing borrows its name from a fleet of warships operated by a fierce woman known for her prowess on the water. It’s fitting that the Tacoma brewery is just up the hill from the Thea Foss Waterway, named after another fierce woman who once ruled our waters.

Read More
Ashley Ryan
Kitsap Credit Union – Poulsbo

Blog post excerpt text. Cras ut justo ac augue faucibus egestas ut eu felis. Morbi metus augue, tincidunt et velit eu, iaculis ultricies ante. Etiam placerat orci sodales erat rutrum congue. 

Read More
Ashley Ryan