Lighthouse Christian School

 

Merit constructed a 5,520 square foot pre-engineered metal building, covered with an open sided play area with a basketball and four square court. The building was a Butler Building, and the architectural design was by TCF Architects.

Along with the building, Merit updated the properties storm system to inclde a new bioretention pond, new catch basins and underground piping, a Contech stormwater filtration system, and the fill in of a no longer needed detention pond that Merit transitioned to a new parking lot. Merit also updated the facilities parking lot with a 23,800 square foot parking lot and bus loop to include new curbs, sidewalks, new lighting, and guardrails. The parking and storm system design was by JMJ Team.

One fun part of the construction process was students writing inspiring phrases and bible verses on the steel beams of the playshed.

"Merit Construction is fantastic to work with. They are attentive to your needs, produce quality work, and make sure that you are well satisfied with the finished project. I have been impressed with how responsive the team has been throughout the process and how they worked to run the project efficiently and safely. Our families and donors at Lighthouse Christian School have been effusive with the praise about the quality of our construction projects and that would not have happened without the team at Merit Construction."

Stephen Roddy, Head of School

Location: Gig harbor, WA | Architect: TCF Architects | Type: New construction