Toray Composite Materials America, Inc. — Recycle Center

 
merit-construction-toray-recycle-center-4.jpg

The Recycle Center at Toray Composites Materials America, Inc. was a 10,682 SF conventional steel building addition to their existing facility. This was a team build project. The scope included earthwork, utilities, concrete loading dock, forklift ramp for access into the building, structural steel, insulated metal wall panels, roofing, fire protection and electrical work. We worked with the client on storage logistics, plastic bailing areas and equipment requirements for their compactors and other equipment.

Location: Fredrickson, WA | Architect: TAS | Type: Addition